New Hydro Dam at the base of the existing intake spillway area.
Kramer Ausenco carried out design checks of contractor’s drawings to ensure they comply with the PNG Building and Structural codes on a as required basis.
- Project
- Yonki Toe of the Dam Hydro Project
- Location
- Yonki Dam, Eastern Highlands Province, PNG
- Client
- PB
- Project Type
- Hydro Project
- Year Completed
- 2009