URS Australia had designed a waste management facility for the Hides Waste Management Plans for Exxon Mobil.
Preliminary drawings encompassed Civil, Structural, Architectural and building works. Client wanted an independent consulting firm based in PNG with the local experience and knowledge to review the constructability of the designs.
Kramer Ausenco was engaged by the Client to review the concept preliminary designs with regard to the constructability with guidance of the local PNG Standards and Codes (Earthquake Code etc.).
Kramer Ausenco reviewed and commented on all the aspects and provided back to the Client.
- Project
- Hides Waste Management Area URS
- Location
- Hides, Southern Highlands, PNG
- Client
- URS Australia
- Project Type
- Resources
- Year Completed
- 2010