The project involved three (3) phases of works which were undertaken concurrently and included the following;
Phase 1 – Structural reconstruction of approximately 784m of existing coastal protection measure to the Mulinu’u Peninsular. Works included the provision of improved drainage, concrete boat-ramps and a 1500 wide walkway esplanade with steps atop the new seawall.
Phase 2 – Structural reconstruction of approximately 815m of existing almost non-existent coastal protection measures to the foreshore at Fasito’o-uta. Works included the provision of improved drainage, concrete boat-ramps and foreshore access stairs
Phase 3 – Structural rehabilitation of approximately 4,169m of existing almost non-existent coastal protection measures to the foreshore at Manono-uta and Apolima-uta. Works included the provision of improved drainage and concrete boat-ramps.
- Project
- Fasitoo-uta, Manono-uta & Mulinuu Seawall
- Location
- Apia, Samoa
- Client
- Government of Samoa, Ministry of Works
- Project Type
- Seawall Construction
- Year Completed
- 2004