Construction of a 32.8m span bridge in a curve section across the Boroko Creek on the Main Access Road leading into and out of the Port Moresby (Jackson’s) International Airport (Erima End) National Capital district.
The bridge project was part of the Port Moresby (Jackson’s) International Airport Redevelopment Project.
This bridge also carried all major Eda Ranu Services (Water and Sewerage), and Telekom Services to the Airport area.
Consulting Services included engineering design, geotechnical investigation, topographic survey, cost studies, seismic design and preparation of technical specification. Kramer Ausenco also provided construction supervision of the bridge construction.
- Project
- Boroko Creek Bridge
- Location
- Boroko (Erima) Creek, Port Moresby, PNG
- Client
- PNG Civil Aviation Authority
- Project Type
- Bridge
- Year Completed
- 1996
Related Documents
-
Boroko Creek Bridge
326 kB